+44 (0) 28 2587 8650

On Site Seeing First Stage Of Air Tightness Detailing

...13.05.2022 The first stage is slab wrapping; this is used to stop air leakage at first floor level into the cavities.

The slab wrap & tape is from ECOHomes Store

There are 3 very important stages of a low energy design:

1. Extra wide cavity walls for greater levels of insulation

2. Slab Wrap membrane & tape to stop air leakage into the cavities

3. Thermal blocks by Mannock to stop a cold bridge

 

All of this will reduce your energy bills & ensure a healthier, more comfortable standard of living!

 

With the first stage of Air Tightness Detailing Complete We are Now Ready for Pre-Cast Slabs🙌

 

Contact us today

028 2587 8650 📞

info@fmkltd.com 📩

www.fmkni.com 🌐

www.ecohomesstore.co.uk 🌐

 

#lowenergy #ecohome #energysaving #buildrightbuildairtight #airtightness #energyefficient