FMK’s office extension project McBurney transport is well under way😁

...18.01.2022 The basement is now constructed with the upper ground floor slabs recently installed. Blockwork continues to the first floor level. 👌The floor of this level will be open web engineered joists owing to the services required to run through to the different office areas. ✅

This includes mechanical heat recovery with ventilation which is being incorporated into this project to provide ventilation due the COVID crisis but with recovered heat put back into the incoming fresh air👌👌

 

The overall extension to the offices has been designed for good energy efficiency to reduce running costs, this being a major concern for businesses at the minute.

If you are considering extending / improving your premises, give us a call to discuss your project on 028 2587 8650 or email info@fmkltd.com 📞📨

 

#officeextension #businessextension #MVHRSystem #mechanicalengineering #energyefficiency #mcburneytransport #ballymenaarchitects